Safety PacksAI Assistant
← Risk Assessment Generator
Ready Risk AssessmentConstruction9 Hazards

Core Drilling Risk Assessment

Review the critical hazards, potential consequences, persons at risk and recommended control measures for Core Drilling in one professional HSE workspace.

9
Ready Hazards
Activity-specific HSE risk library
5×5
Risk Matrix
Ready for professional risk evaluation
TR / EN
Bilingual
Turkish and English HSE content
HSE Risk Library

Core Drilling Hazards & Controls

Review the key hazards, consequences and control measures for Core Drilling in a structured professional HSE format.

01
Hazard

Contact with hidden electrical or process service

Potential Consequence

Electric shock or process release

Persons at Risk

Drilling operator

Existing Controls

Drawing review and service scanning

Additional Controls

Verify formal clearance for the drilling location

02
Hazard

Contact with rotating equipment

Potential Consequence

Entanglement or laceration

Persons at Risk

Operator

Existing Controls

Suitable equipment and safe-work method

Additional Controls

Keep loose clothing and materials away

03
Hazard

Core dropping to lower level

Potential Consequence

Struck-by injury

Persons at Risk

Workers below

Existing Controls

Exclusion zone below

Additional Controls

Capture or support the core in a controlled manner

04
Hazard

Drilling into hidden electrical or process service

Potential Consequence

Electric shock or process release

Persons at Risk

Drilling personnel

Existing Controls

Drawing review and scanning

Additional Controls

Scan walls or floors with suitable equipment before drilling

05
Hazard

Inadequate core-drill securing

Potential Consequence

Machine movement or impact

Persons at Risk

Operator

Existing Controls

Suitable anchorage and machine securing

Additional Controls

Verify machine stability before drilling

06
Hazard

Core section falling to lower level

Potential Consequence

Dropped-object injury

Persons at Risk

Personnel below

Existing Controls

Exclusion zone below

Additional Controls

Control the exit side and physically retain the core section

07
Hazard

Water reaching electrical connections during core drilling

Potential Consequence

Electric shock or short circuit

Persons at Risk

Workers performing the activity and nearby personnel

Existing Controls

Authorized personnel, pre-work checks, suitable equipment and site procedures

Additional Controls

Control water flow and protect electrical connections from wet areas

08
Hazard

Inadequate anchoring of core-drill stand

Potential Consequence

Machine movement or operator injury

Persons at Risk

Workers performing the activity and nearby personnel

Existing Controls

Authorized personnel, pre-work checks, suitable equipment and site procedures

Additional Controls

Verify stand anchorage and connections before drilling

09
Hazard

High noise during core drilling

Potential Consequence

Hearing damage

Persons at Risk

Workers performing the activity and nearby personnel

Existing Controls

Authorized personnel, pre-work checks, suitable equipment and site procedures

Additional Controls

Use hearing protection suitable for the noise level

Related Risk Assessments

More from Construction

Explore related activities, hazards and control measures from the same HSE risk category.

Explore Risk Library →
SERNEM

Turn this into your project risk assessment

Use these ready hazards as your starting point, customize controls, evaluate risk levels and prepare your project-specific assessment in SERNEM.

Start Risk Assessment
SERNEM
Core Drilling RISK ASSESSMENT
SRN-HIRARC
Revision: 1.0
ACTIVITYCore DrillingCATEGORYConstruction
#ActivityHazardConsequencePersons at RiskExisting Risk ControlLSRiskAction Required / Additional ControlsPerson in ChargeDue DateRLRSResidual Risk
01Core DrillingContact with hidden electrical or process serviceElectric shock or process releaseDrilling operatorDrawing review and service scanning3412
High
Verify formal clearance for the drilling location--224
Low
02Core DrillingContact with rotating equipmentEntanglement or lacerationOperatorSuitable equipment and safe-work method339
Medium
Keep loose clothing and materials away--122
Low
03Core DrillingCore dropping to lower levelStruck-by injuryWorkers belowExclusion zone below236
Medium
Capture or support the core in a controlled manner--122
Low
04Core DrillingDrilling into hidden electrical or process serviceElectric shock or process releaseDrilling personnelDrawing review and scanning3412
High
Scan walls or floors with suitable equipment before drilling--224
Low
05Core DrillingInadequate core-drill securingMachine movement or impactOperatorSuitable anchorage and machine securing236
Medium
Verify machine stability before drilling--122
Low
06Core DrillingCore section falling to lower levelDropped-object injuryPersonnel belowExclusion zone below339
Medium
Control the exit side and physically retain the core section--122
Low
07Core DrillingWater reaching electrical connections during core drillingElectric shock or short circuitWorkers performing the activity and nearby personnelAuthorized personnel, pre-work checks, suitable equipment and site procedures3412
High
Control water flow and protect electrical connections from wet areas--224
Low
08Core DrillingInadequate anchoring of core-drill standMachine movement or operator injuryWorkers performing the activity and nearby personnelAuthorized personnel, pre-work checks, suitable equipment and site procedures236
Medium
Verify stand anchorage and connections before drilling--122
Low
09Core DrillingHigh noise during core drillingHearing damageWorkers performing the activity and nearby personnelAuthorized personnel, pre-work checks, suitable equipment and site procedures236
Medium
Use hearing protection suitable for the noise level--122
Low
Prepared By
Name / Signature / Date
Reviewed By
Name / Signature / Date
Approved By
Name / Signature / Date
SERNEM • Professional Risk AssessmentWork should not begin until required controls are implemented.