5×5 HSE RISK ASSESSMENT
5×5 HSE Risk Matrix Calculator
Start by defining the activity and hazard being assessed, then evaluate likelihood, severity, control measures and the residual risk level together.
5×5: likelihood × severity; low 1–4, medium 5–9, high 10–16, extreme 17–25. HIRARC uses the same 1–25 range, labelling 17–25 critical. Records are not automatically merged.
Unsaved draft in this tab only. KPI records and trends stay unchanged.
INTERACTIVE CALCULATOR
Risk Matrix Calculator
Select likelihood and severity to calculate the risk score and risk level instantly.
DEFINE INITIAL RISK
Select likelihood and severity for the current situation.
- ✓Review existing control measures.
- ✓Inform the site supervisor.
- ✓Monitor the risk during the work.
DEFINE CONTROL MEASURES
Describe existing or planned control measures.
CALCULATE RESIDUAL RISK
Evaluate likelihood and severity after controls.
Residual risk is at an acceptable level after controls.
Risk reduced by 56%.
5 × 5 RISK MATRIX
Risk Level Overview
View the selected likelihood and severity position on the matrix.