SafeBase Professional Risk Library
Ready-Made Risk Assessment Library Select an activity and load ready-made risk items directly into your HIRARC assessment.
Select Ready Activity Select activity... Working at Height — 15 risk items Scaffold Erection — 9 risk items Scaffold Inspection — 9 risk items Hot Work — 9 risk items Confined Space Entry — 9 risk items Excavation — 9 risk items Electrical Maintenance — 9 risk items LOTO / Energy Isolation — 9 risk items Forklift Operation — 9 risk items Mobile Crane Operation — 9 risk items Lifting Operations — 9 risk items Banksman / Signal Person Operation — 9 risk items Grinding — 9 risk items Welding — 9 risk items Manual Handling — 9 risk items Chemical Handling — 9 risk items Pressure Testing — 9 risk items Housekeeping — 9 risk items Office Work — 9 risk items Site Traffic Management — 9 risk items Roof Work — 9 risk items MEWP / Mobile Elevating Work Platform — 6 risk items Scaffold Dismantling — 9 risk items Ladder Work — 9 risk items Steel Structure Erection — 9 risk items Trenching — 9 risk items Line Breaking — 9 risk items Flange Breaking — 9 risk items Hydrostatic Testing — 9 risk items Pneumatic Testing — 9 risk items Air Blowing — 9 risk items Painting — 9 risk items Spray Painting — 9 risk items Abrasive Blasting — 9 risk items Concrete Pouring — 9 risk items Formwork Installation / Removal — 9 risk items Rebar Work — 9 risk items Demolition — 9 risk items Cable Pulling — 9 risk items Temporary Electrical Supply — 9 risk items Pipe Installation — 9 risk items Pipe Support Installation — 9 risk items Valve Maintenance — 9 risk items Pump Maintenance — 9 risk items Compressor Maintenance — 9 risk items Rotating Equipment Maintenance — 9 risk items Heat Exchanger Maintenance — 9 risk items Tank Maintenance — 9 risk items Tank Cleaning — 9 risk items Fuel Transfer — 9 risk items Gas Cylinder Handling — 9 risk items Gas Cylinder Storage — 9 risk items Mechanical Isolation — 9 risk items Equipment Commissioning — 9 risk items Startup Activities — 9 risk items Shutdown Activities — 9 risk items Waste Handling — 9 risk items Night Work — 9 risk items Work in Extreme Heat — 9 risk items Fire Watch Activities — 9 risk items Roof Maintenance — 9 risk items MEWP Inspection — 9 risk items Mobile Equipment Daily Inspection — 9 risk items Excavator Operation — 9 risk items Loader Operation — 9 risk items Telehandler Operation — 9 risk items Vehicle Reversing — 9 risk items Loading / Unloading — 9 risk items Material Storage — 9 risk items Steel Plate Handling — 9 risk items Cylinder Loading / Unloading — 9 risk items Core Drilling — 9 risk items Concrete Cutting — 9 risk items Wall / Floor Penetration — 9 risk items Surface Preparation — 9 risk items Solvent Cleaning — 9 risk items Leak Testing — 9 risk items Steam Blowing — 9 risk items Emergency Response Activities — 9 risk items Lone Working — 9 risk items Hand & Power Tool Use — 9 risk items Drilling — 9 risk items Roofing Work — 9 risk items Temporary Platform Work — 9 risk items Suspended Basket / Man Basket Work — 9 risk items Work Near Open Edges — 9 risk items Mechanical Material Handling — 9 risk items Pipe Handling — 9 risk items Fuel Storage — 9 risk items Chemical Storage — 9 risk items Surface Grinding — 9 risk items Leak Repair — 9 risk items General Maintenance Work — 6 risk items Valve Removal — 9 risk items Pump Alignment — 9 risk items Compressor Start-up — 9 risk items Barricading / Exclusion Zone Setup — 9 risk items Dropped Object Prevention — 9 risk items Cold Weather Work — 9 risk items Emergency Evacuation — 9 risk items ⚡ Load 15 Risks
Risks in this template
15 / 15 risks selected
✓ Select All ✕ Clear Selection
✓ 01 • Fall from height
Serious injury, permanent disability or fatality
✓ 02 • Dropped objects
Head injury, serious injury or fatality
✓ 03 • Open edge or floor opening
Serious injury or fatality following a fall
✓ 04 • Unsuitable anchorage point
Failure of fall-protection system and fatality
✓ 05 • Suspension trauma
Loss of consciousness, serious health effects or fatality
✓ 06 • Insufficient lighting
Misstep, loss of balance and fall
✓ 07 • Fall-protection equipment contacting a sharp edge
Damage to lanyard or lifeline resulting in a fall
✓ 08 • Slip or trip at elevated work level
Loss of balance and fall from height
✓ 09 • Insufficient fall-clearance distance
Impact with a lower level or structure during a fall
✓ 10 • Swing fall caused by lateral anchorage
Worker striking the structure or suffering serious fall injury
✓ 11 • Use of incompatible fall-protection connectors
Unintentional connector opening resulting in a fall
✓ 12 • Incorrect installation or tensioning of temporary lifeline
Failure of the fall-protection system
✓ 13 • Prolonged suspension following a fall
Suspension intolerance and serious health effects
✓ 14 • Fragile surface incorrectly assumed to be load-bearing
Fall from height following failure of the fragile surface
✓ 15 • Fall-protection equipment damaged by chemicals or hot surfaces
Fall resulting from loss of lanyard or harness integrity
⚠️ Ready-made content includes suggested initial likelihood and severity scores. A competent assessor must verify or adjust these values based on actual site conditions, equipment, personnel and existing controls.
Risk Register
Professional Risk Assessment Add multiple hazards to one assessment and manage initial and residual risk levels independently.
📄 PDF / Print 💾 Save Assessment + Add Risk
1–4 LOW 5–9 MEDIUM 10–19 HIGH 20–25 CRITICAL
DEPARTMENT - ASSET / AREA - PROCESS / METHOD - PREPARED BY - REVIEWED BY - APPROVED BY -
No HAZARD IDENTIFICATION RISK ANALYSIS RISK CONTROL Work Activity Hazard Consequence / Effect Persons at Risk Existing Risk Control L S Risk Action Required / Additional Controls Person in Charge Due Date RL RS Residual Risk 01 - - - - - 1 1 1 Low - - - 1 1 1 Low
Prepared By -
Name / Signature / Date
Reviewed By -
Name / Signature / Date
Approved By -
Name / Signature / Date
SafeBase • Professional Risk Assessment Work should not begin until required controls are implemented.