Crane overturn
Serious injury or fatality
Operator and lifting team
Ground assessment, outrigger setup and capacity limits
Revalidate operation if setup conditions change
Review the critical hazards, potential consequences, persons at risk and recommended control measures for Mobile Crane Operation in one professional HSE workspace.
Review the key hazards, consequences and control measures for Mobile Crane Operation in a structured professional HSE format.
Serious injury or fatality
Operator and lifting team
Ground assessment, outrigger setup and capacity limits
Revalidate operation if setup conditions change
Crushing or fatality
Lifting team
Lift plan, suitable rigging and exclusion zone
Prevent personnel from being under suspended loads
Electric shock or fatality
Operator and lifting team
Power-line identification, clearance control and signal person
Verify safe clearance in the site lift plan
Load swing, impact or overturn
Lifting team and nearby personnel
Wind monitoring and manufacturer limits
Stop lifting when wind limits are exceeded
Crane overturn
Operator and lifting team
Ground assessment and suitable outrigger mats
Verify underground voids and ground-bearing capacity for critical lifts
Uncontrolled crane or load movement
Lifting team
Designated signal person and radio communication where required
Stop all movement if communication is unclear or lost
Electric shock or fatality
Crane crew and surrounding personnel
Lift plan and work-area hazard assessment
Establish safe clearance from power lines and use a spotter where required
Crane overturn and fatal injury
Crane operator and personnel in the lifting area
Ground assessment and suitable outrigger pads
Verify ground-bearing capacity and calculate load distribution
Uncontrolled load movement or collision
Crane operator, banksman and rigging crew
Standard hand signals and designated banksman
Use radio communication when visibility is lost and stop the lift if communication fails
Explore related activities, hazards and control measures from the same HSE risk category.
Use these ready hazards as your starting point, customize controls, evaluate risk levels and prepare your project-specific assessment in SERNEM.
Start Risk Assessment| ACTIVITY | Mobile Crane Operation | CATEGORY | Lifting |
| # | Activity | Hazard | Consequence | Persons at Risk | Existing Risk Control | L | S | Risk | Action Required / Additional Controls | Person in Charge | Due Date | RL | RS | Residual Risk |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | Mobile Crane Operation | Crane overturn | Serious injury or fatality | Operator and lifting team | Ground assessment, outrigger setup and capacity limits | 3 | 5 | 15 High | Revalidate operation if setup conditions change | - | - | 2 | 2 | 4 Low |
| 02 | Mobile Crane Operation | Suspended load drop | Crushing or fatality | Lifting team | Lift plan, suitable rigging and exclusion zone | 3 | 5 | 15 High | Prevent personnel from being under suspended loads | - | - | 2 | 2 | 4 Low |
| 03 | Mobile Crane Operation | Approach to overhead power lines | Electric shock or fatality | Operator and lifting team | Power-line identification, clearance control and signal person | 3 | 5 | 15 High | Verify safe clearance in the site lift plan | - | - | 2 | 2 | 4 Low |
| 04 | Mobile Crane Operation | Loss of load control due to wind | Load swing, impact or overturn | Lifting team and nearby personnel | Wind monitoring and manufacturer limits | 3 | 3 | 9 Medium | Stop lifting when wind limits are exceeded | - | - | 1 | 2 | 2 Low |
| 05 | Mobile Crane Operation | Ground failure beneath outrigger | Crane overturn | Operator and lifting team | Ground assessment and suitable outrigger mats | 3 | 3 | 9 Medium | Verify underground voids and ground-bearing capacity for critical lifts | - | - | 1 | 2 | 2 Low |
| 06 | Mobile Crane Operation | Communication failure | Uncontrolled crane or load movement | Lifting team | Designated signal person and radio communication where required | 3 | 3 | 9 Medium | Stop all movement if communication is unclear or lost | - | - | 1 | 2 | 2 Low |
| 07 | Mobile Crane Operation | Crane boom approaching overhead power lines | Electric shock or fatality | Crane crew and surrounding personnel | Lift plan and work-area hazard assessment | 3 | 5 | 15 High | Establish safe clearance from power lines and use a spotter where required | - | - | 2 | 2 | 4 Low |
| 08 | Mobile Crane Operation | Ground failure beneath crane outrigger | Crane overturn and fatal injury | Crane operator and personnel in the lifting area | Ground assessment and suitable outrigger pads | 3 | 5 | 15 High | Verify ground-bearing capacity and calculate load distribution | - | - | 2 | 2 | 4 Low |
| 09 | Mobile Crane Operation | Loss of communication during lifting operation | Uncontrolled load movement or collision | Crane operator, banksman and rigging crew | Standard hand signals and designated banksman | 3 | 3 | 9 Medium | Use radio communication when visibility is lost and stop the lift if communication fails | - | - | 1 | 2 | 2 Low |