Overview
Steel erection requires an engineered sequence because a partially connected member can fail before its permanent load path exists. The erection team must verify temporary bracing, ground support, lifting and rigging arrangements, fall prevention, and the interface between site work and lower-level pedestrian access. Release of lifting equipment and removal of temporary works require explicit technical authorization. This guide cannot determine structural capacity, connection design or load limits.