PIPE SPOOL TEMPORARY SUPPORTS TOOLBOX TALK

Prevent unintended pipe movement during installation.

Checking account…
← Back to Toolbox Library

Preview is public. A free SERNEM account is required to download the standard PDF.

Toolbox Topic

PIPE SPOOL TEMPORARY SUPPORTS TOOLBOX TALK

Duration

8–10 MINUTES

Date

Site / Area

Supervisor

Company

Participants

Document No

OBJECTIVE

✓

Prevent pipe movement, falling loads and crushing when temporary supports are used for spool installation or removal.

TOPIC EXPLANATION

✓

A spool may seem stable while held by rigging or flange bolts, but can shift when a connection is released.

✓

Competent planning must address spool mass, centre of gravity, support capacity and possible side loads.

✓

Do not remove lifting gear or temporary support before permanent restraints and supports are proven effective.

REALISTIC SITE SCENARIO

✓

A spool was placed near its flange and the lifting sling was loosened.

✓

An unfinished temporary support allowed the spool to rotate downward.

✓

Rated supports and a controlled release sequence would have prevented movement.

REMEMBER

✓

Do not release lifting gear or pipe connections until the spool is safely supported.

KEY HAZARDS

✓

Sudden spool rotation.

✓

Insufficient support capacity.

✓

Temporary stand overturning.

✓

Hands trapped at flanges.

✓

Falling pipe end.

✓

Incomplete permanent supports.

✓

Unexpected load shift.

✓

Conflicting crew instructions.

CONTROL MEASURES

✓

Verify the installation support plan.

✓

Confirm spool mass and balance.

✓

Approve temporary support capacity.

✓

Place supports on stable ground.

✓

Restrain potential sideways movement.

✓

Use one coordinated signalling system.

✓

Keep pinch zones clear.

✓

Do not release rigging prematurely.

✓

Inspect permanent hangers and shoes.

✓

Remove temporary supports in sequence.

SUPERVISOR TALKING SCRIPT

✓

The spool must never rely on flange bolts or makeshift packing for stability. Check support capacity before releasing any sling or connection.

DISCUSSION QUESTIONS

✓

Do we know the spool weight?

✓

Who approved the supports?

✓

Could the load move sideways?

✓

When can rigging be released?

✓

Are permanent supports ready?

PRE-WORK VERIFICATION

✓

Plan available

✓

Mass verified

✓

Balance assessed

✓

Supports rated

✓

Ground stable

✓

Side movement controlled

✓

Signals agreed

✓

Pinch points clear

✓

Permanent supports checked

✓

Removal sequence approved

ATTENDANCE AND APPROVAL

✓

Project / Site

✓

Date

✓

Presented by

✓

Work area

Attendance and Signature

#NamePositionSignature
1
2
3
4
5
6
7
8
9
10
11
12

Supervisor Signature

HSE Approval

SERNEM HSE Resource — Approved site procedure, risk assessment, manufacturer instructions and local regulations take priority.