CONCRETE CORE DRILLING AND HIDDEN SERVICES TOOLBOX TALK
Locate embedded services before drilling.
Preview is public. A free SERNEM account is required to download the standard PDF.
Toolbox Topic
CONCRETE CORE DRILLING AND HIDDEN SERVICES TOOLBOX TALK
Duration
8–10 MINUTES
Date
Site / Area
Supervisor
Company
Participants
Document No
OBJECTIVE
Prevent strikes to embedded cables and pipes, as well as injury during concrete core drilling.
TOPIC EXPLANATION
The drill path may intersect concealed electricity, gas, water or process services. Old drawings alone do not establish clearance.
Use authorised drilling permits, updated plans and competent scanning to confirm location and depth.
Also control drilling water, rotating parts, falling cores, lower floors and the finished opening.
REALISTIC SITE SCENARIO
A crew prepared a floor core for a pipe penetration.
An undocumented cable tray below the slab created a strike and falling-object hazard.
Service scans, lower-level controls and approved drilling locations would have reduced risk.
REMEMBER
Do not core drill until the drilling point and depth are verified.
KEY HAZARDS
Contact with hidden electrical cables.
Damage to gas or process piping.
Entanglement in rotating equipment.
Falling concrete cores.
Water near electrical tools.
Unsecured drill mounting.
Silica dust or splash exposure.
Fall through the new opening.
CONTROL MEASURES
Obtain the approved drilling permit.
Review current drawings and revisions.
Scan for hidden services.
Mark the point and depth.
Escalate suspected services for confirmation.
Secure the coring equipment.
Check and segregate lower levels.
Control water and electrical supply.
Secure the core against falling.
Cover the opening after drilling.
SUPERVISOR TALKING SCRIPT
We will not drill blindly through a slab. Hidden services must be surveyed and the location approved. Protect the level below and the opening after work.
DISCUSSION QUESTIONS
Is the drill point approved?
Were embedded services scanned?
Who works below us?
How is the machine anchored?
How will the hole be protected?
PRE-WORK VERIFICATION
Permit approved
Drawings reviewed
Service scan complete
Depth verified
Point marked
Drill secured
Lower level segregated
Water and power safe
Core retained
Opening protection ready
ATTENDANCE AND APPROVAL
Project / Site
Date
Presented by
Work area
Attendance and Signature
| # | Name | Position | Signature |
|---|---|---|---|
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| 11 | |||
| 12 |
Supervisor Signature
HSE Approval
SERNEM HSE Resource — Approved site procedure, risk assessment, manufacturer instructions and local regulations take priority.