CONCRETE CORE DRILLING AND HIDDEN SERVICES TOOLBOX TALK

Locate embedded services before drilling.

Checking account…
← Back to Toolbox Library

Preview is public. A free SERNEM account is required to download the standard PDF.

Toolbox Topic

CONCRETE CORE DRILLING AND HIDDEN SERVICES TOOLBOX TALK

Duration

8–10 MINUTES

Date

Site / Area

Supervisor

Company

Participants

Document No

OBJECTIVE

✓

Prevent strikes to embedded cables and pipes, as well as injury during concrete core drilling.

TOPIC EXPLANATION

✓

The drill path may intersect concealed electricity, gas, water or process services. Old drawings alone do not establish clearance.

✓

Use authorised drilling permits, updated plans and competent scanning to confirm location and depth.

✓

Also control drilling water, rotating parts, falling cores, lower floors and the finished opening.

REALISTIC SITE SCENARIO

✓

A crew prepared a floor core for a pipe penetration.

✓

An undocumented cable tray below the slab created a strike and falling-object hazard.

✓

Service scans, lower-level controls and approved drilling locations would have reduced risk.

REMEMBER

✓

Do not core drill until the drilling point and depth are verified.

KEY HAZARDS

✓

Contact with hidden electrical cables.

✓

Damage to gas or process piping.

✓

Entanglement in rotating equipment.

✓

Falling concrete cores.

✓

Water near electrical tools.

✓

Unsecured drill mounting.

✓

Silica dust or splash exposure.

✓

Fall through the new opening.

CONTROL MEASURES

✓

Obtain the approved drilling permit.

✓

Review current drawings and revisions.

✓

Scan for hidden services.

✓

Mark the point and depth.

✓

Escalate suspected services for confirmation.

✓

Secure the coring equipment.

✓

Check and segregate lower levels.

✓

Control water and electrical supply.

✓

Secure the core against falling.

✓

Cover the opening after drilling.

SUPERVISOR TALKING SCRIPT

✓

We will not drill blindly through a slab. Hidden services must be surveyed and the location approved. Protect the level below and the opening after work.

DISCUSSION QUESTIONS

✓

Is the drill point approved?

✓

Were embedded services scanned?

✓

Who works below us?

✓

How is the machine anchored?

✓

How will the hole be protected?

PRE-WORK VERIFICATION

✓

Permit approved

✓

Drawings reviewed

✓

Service scan complete

✓

Depth verified

✓

Point marked

✓

Drill secured

✓

Lower level segregated

✓

Water and power safe

✓

Core retained

✓

Opening protection ready

ATTENDANCE AND APPROVAL

✓

Project / Site

✓

Date

✓

Presented by

✓

Work area

Attendance and Signature

#NamePositionSignature
1
2
3
4
5
6
7
8
9
10
11
12

Supervisor Signature

HSE Approval

SERNEM HSE Resource — Approved site procedure, risk assessment, manufacturer instructions and local regulations take priority.