MAN BASKET / PERSONNEL LIFTING TOOLBOX TALK

Personnel lifting is not a routine load lift.

Equipment, communication and rescue controls for crane-suspended personnel lifting.

Checking account…
← Back to Toolbox Library

Preview is public. A free SERNEM account is required to download the standard PDF.

Toolbox Topic

MAN BASKET / PERSONNEL LIFTING TOOLBOX TALK

Duration

8–10 minutes

Date

Site / Area

Supervisor

Company

Participants

Document No

OBJECTIVE

✓

Prevent falls, crushing, equipment failure and communication loss during crane-suspended personnel basket operations.

WHY IT MATTERS

✓

Equipment failure during personnel lifting directly threatens human life.

✓

The basket, crane and rigging must be approved for personnel lifting.

✓

Rescue and communication arrangements must be ready before the lift.

REALISTIC SITE SCENARIO

✓

A personnel basket operation relied only on hand signals.

✓

Communication was lost when the basket moved behind a structure.

✓

Radio communication and a dedicated banksman would have prevented the issue.

REMEMBER

✓

Personnel lifting requires stricter planning, equipment and communication controls than normal lifting.

KEY HAZARDS

✓

Sudden basket movement.

✓

Crane or rigging failure.

✓

Fall inside the basket.

✓

Crushing between basket and structure.

✓

Loss of communication.

✓

Unsuitable anchorage or harness connection.

✓

Wind effects.

✓

Inability to evacuate during emergency.

CONTROLS

✓

Prepare an approved personnel-lifting plan.

✓

Verify personnel basket certification.

✓

Inspect crane, hook block and rigging.

✓

Use full-body harnesses connected to approved basket anchors.

✓

Provide a dedicated banksman and reliable communication.

✓

Perform a trial lift.

✓

Identify basket-to-structure pinch points.

✓

Check wind limits.

✓

Prepare emergency lowering and rescue arrangements.

✓

Keep the crane operator dedicated to the lifting operation.

SUPERVISOR MESSAGE

✓

Team, personnel lifting is a special high-risk operation. The basket will not move until planning, trial lift, communication and rescue preparations are complete.

TEAM QUESTIONS

✓

Is the lift plan approved?

✓

Is the basket certified?

✓

Who is the banksman?

✓

How will communication be maintained?

✓

Is the rescue plan ready?

✓

Are wind conditions acceptable?

FIELD VERIFICATION

✓

Lift plan approved

✓

Basket certified

✓

Crane suitable

✓

Rigging suitable

✓

Harness connected

✓

Banksman ready

✓

Communication tested

✓

Trial lift completed

✓

Rescue plan ready

✓

Wind acceptable

ATTENDANCE AND APPROVAL

✓

Project / Site

✓

Date

✓

Presented by

✓

Work area

Attendance and Signature

#NamePositionSignature
1
2
3
4
5
6
7
8
9
10
11
12

Supervisor Signature

HSE Approval