Site Traffic Management Risk Assessment

Review the critical hazards, potential consequences, persons at risk and recommended control measures for Site Traffic Management in one professional HSE workspace.

9
Ready Hazards
Activity-specific HSE risk library
5×5
Risk Matrix
Ready for professional risk evaluation
TR / EN
Bilingual
Turkish and English HSE content
HSE Risk Library

Site Traffic Management Hazards & Controls

Review the key hazards, consequences and control measures for Site Traffic Management in a structured professional HSE format.

01
Hazard

Vehicle-pedestrian collision

Potential Consequence

Serious injury or fatality

Persons at Risk

Pedestrians and drivers

Existing Controls

Segregated routes, barriers, speed limits and signage

Additional Controls

Use physical segregation or spotters at critical crossings

02
Hazard

Reversing vehicle

Potential Consequence

Crushing or collision

Persons at Risk

Pedestrians and other drivers

Existing Controls

Reversing alarm, camera and spotter where required

Additional Controls

Design traffic flow to minimize reversing where practicable

03
Hazard

Blind intersection or restricted visibility

Potential Consequence

Vehicle collision

Persons at Risk

Drivers and pedestrians

Existing Controls

Mirrors, signage, speed control and horn use

Additional Controls

Remove visibility obstructions or redesign the intersection

04
Hazard

Vehicle and pedestrian routes crossing

Potential Consequence

Collision, crushing or fatality

Persons at Risk

Pedestrians and vehicle operators

Existing Controls

Vehicle-pedestrian segregation and designated routes

Additional Controls

Use physical segregation or controlled crossings at critical intersections

05
Hazard

Vehicle movement at blind spots

Potential Consequence

Collision with pedestrians or vehicles

Persons at Risk

Site personnel and drivers

Existing Controls

Speed limits, warning signs and horn

Additional Controls

Use mirrors or a banksman at critical blind spots

06
Hazard

Loss of control during reversing

Potential Consequence

Collision or crushing

Persons at Risk

Operator, banksman and pedestrians

Existing Controls

Reverse alarm and banksman support

Additional Controls

Design traffic flow to minimize reversing wherever practicable

07
Hazard

Vehicle exceeding site speed limit

Potential Consequence

Collision, crushing or serious injury

Persons at Risk

Drivers and pedestrians

Existing Controls

Site speed limits and traffic signage

Additional Controls

Monitor compliance through speed controls, radar or supervisor observations

08
Hazard

Parked vehicles obstructing visibility

Potential Consequence

Vehicle-pedestrian collision at blind spot

Persons at Risk

Pedestrians and vehicle operators

Existing Controls

Designated parking areas

Additional Controls

Prevent parking near intersections, pedestrian crossings and blind spots

09
Hazard

Poorly marked temporary traffic arrangement

Potential Consequence

Wrong routing, collision or pedestrian exposure

Persons at Risk

Site personnel and drivers

Existing Controls

Temporary traffic plan and signage

Additional Controls

Mark changing traffic routes with current barriers, directional signs and lighting

Related Risk Assessments

More from Traffic

Explore related activities, hazards and control measures from the same HSE risk category.

Explore Risk Library →
SERNEM

Turn this into your project risk assessment

Use these ready hazards as your starting point, customize controls, evaluate risk levels and prepare your project-specific assessment in SERNEM.

Start Risk Assessment
SERNEM
Site Traffic Management RISK ASSESSMENT
SRN-HIRARC
Revision: 1.0
ACTIVITYSite Traffic ManagementCATEGORYTraffic
#ActivityHazardConsequencePersons at RiskExisting Risk ControlLSRiskAction Required / Additional ControlsPerson in ChargeDue DateRLRSResidual Risk
01Site Traffic ManagementVehicle-pedestrian collisionSerious injury or fatalityPedestrians and driversSegregated routes, barriers, speed limits and signage2510
High
Use physical segregation or spotters at critical crossings--224
Low
02Site Traffic ManagementReversing vehicleCrushing or collisionPedestrians and other driversReversing alarm, camera and spotter where required3412
High
Design traffic flow to minimize reversing where practicable--224
Low
03Site Traffic ManagementBlind intersection or restricted visibilityVehicle collisionDrivers and pedestriansMirrors, signage, speed control and horn use236
Medium
Remove visibility obstructions or redesign the intersection--122
Low
04Site Traffic ManagementVehicle and pedestrian routes crossingCollision, crushing or fatalityPedestrians and vehicle operatorsVehicle-pedestrian segregation and designated routes3515
High
Use physical segregation or controlled crossings at critical intersections--224
Low
05Site Traffic ManagementVehicle movement at blind spotsCollision with pedestrians or vehiclesSite personnel and driversSpeed limits, warning signs and horn236
Medium
Use mirrors or a banksman at critical blind spots--122
Low
06Site Traffic ManagementLoss of control during reversingCollision or crushingOperator, banksman and pedestriansReverse alarm and banksman support3412
High
Design traffic flow to minimize reversing wherever practicable--224
Low
07Site Traffic ManagementVehicle exceeding site speed limitCollision, crushing or serious injuryDrivers and pedestriansSite speed limits and traffic signage3412
High
Monitor compliance through speed controls, radar or supervisor observations--224
Low
08Site Traffic ManagementParked vehicles obstructing visibilityVehicle-pedestrian collision at blind spotPedestrians and vehicle operatorsDesignated parking areas236
Medium
Prevent parking near intersections, pedestrian crossings and blind spots--122
Low
09Site Traffic ManagementPoorly marked temporary traffic arrangementWrong routing, collision or pedestrian exposureSite personnel and driversTemporary traffic plan and signage236
Medium
Mark changing traffic routes with current barriers, directional signs and lighting--122
Low
Prepared By
Name / Signature / Date
Reviewed By
Name / Signature / Date
Approved By
Name / Signature / Date
SERNEM • Professional Risk AssessmentWork should not begin until required controls are implemented.