Incomplete process isolation
Unexpected process release
Maintenance and operations teams
Shutdown and isolation plan
Jointly field-verify completion of isolations
Review the critical hazards, potential consequences, persons at risk and recommended control measures for Shutdown Activities in one professional HSE workspace.
Review the key hazards, consequences and control measures for Shutdown Activities in a structured professional HSE format.
Unexpected process release
Maintenance and operations teams
Shutdown and isolation plan
Jointly field-verify completion of isolations
Conflicting work activities
All shutdown personnel
SIMOPS coordination and daily planning
Apply spatial or time separation for conflicting work
Collision, congestion or delayed evacuation
Site personnel
Traffic plan and controlled access
Apply additional traffic control during peak periods
Pressure or chemical release
Operations and maintenance personnel
Shutdown and depressurization
Verify zero energy before maintenance handover
Thermal burn
Maintenance workers
Cooling period
Verify equipment reaches a safe temperature
Unexpected energy or work conflict
Shutdown teams
PTW and SIMOPS coordination
Coordinate conflicting tasks through daily planning
Entrapment or process hazard
Operations and maintenance personnel
Shutdown procedure and isolation
Fully isolate restart sources before maintenance handover
Thermal burn or process release
Maintenance personnel
Drain and cooldown procedure
Verify temperature and contents before opening the line
SIMOPS conflict or loss of isolation
Shutdown teams
PTW and SIMOPS coordination
Coordinate work packages through a common isolation plan
Use these ready hazards as your starting point, customize controls, evaluate risk levels and prepare your project-specific assessment in SERNEM.
Start Risk Assessment| ACTIVITY | Shutdown Activities | CATEGORY | Shutdown |
| # | Activity | Hazard | Consequence | Persons at Risk | Existing Risk Control | L | S | Risk | Action Required / Additional Controls | Person in Charge | Due Date | RL | RS | Residual Risk |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | Shutdown Activities | Incomplete process isolation | Unexpected process release | Maintenance and operations teams | Shutdown and isolation plan | 2 | 3 | 6 Medium | Jointly field-verify completion of isolations | - | - | 1 | 2 | 2 Low |
| 02 | Shutdown Activities | Simultaneous operations | Conflicting work activities | All shutdown personnel | SIMOPS coordination and daily planning | 2 | 3 | 6 Medium | Apply spatial or time separation for conflicting work | - | - | 1 | 2 | 2 Low |
| 03 | Shutdown Activities | High workforce and traffic density | Collision, congestion or delayed evacuation | Site personnel | Traffic plan and controlled access | 3 | 3 | 9 Medium | Apply additional traffic control during peak periods | - | - | 1 | 2 | 2 Low |
| 04 | Shutdown Activities | Residual process energy | Pressure or chemical release | Operations and maintenance personnel | Shutdown and depressurization | 2 | 3 | 6 Medium | Verify zero energy before maintenance handover | - | - | 1 | 2 | 2 Low |
| 05 | Shutdown Activities | Opening hot equipment too early | Thermal burn | Maintenance workers | Cooling period | 2 | 3 | 6 Medium | Verify equipment reaches a safe temperature | - | - | 1 | 2 | 2 Low |
| 06 | Shutdown Activities | SIMOPS conflict | Unexpected energy or work conflict | Shutdown teams | PTW and SIMOPS coordination | 2 | 3 | 6 Medium | Coordinate conflicting tasks through daily planning | - | - | 1 | 2 | 2 Low |
| 07 | Shutdown Activities | Unexpected restart during shutdown | Entrapment or process hazard | Operations and maintenance personnel | Shutdown procedure and isolation | 3 | 3 | 9 Medium | Fully isolate restart sources before maintenance handover | - | - | 1 | 2 | 2 Low |
| 08 | Shutdown Activities | Hot product remaining in line during shutdown | Thermal burn or process release | Maintenance personnel | Drain and cooldown procedure | 2 | 3 | 6 Medium | Verify temperature and contents before opening the line | - | - | 1 | 2 | 2 Low |
| 09 | Shutdown Activities | Multiple teams working on same system | SIMOPS conflict or loss of isolation | Shutdown teams | PTW and SIMOPS coordination | 2 | 3 | 6 Medium | Coordinate work packages through a common isolation plan | - | - | 1 | 2 | 2 Low |