Demolition Risk Assessment

Review the critical hazards, potential consequences, persons at risk and recommended control measures for Demolition in one professional HSE workspace.

9
Ready Hazards
Activity-specific HSE risk library
5×5
Risk Matrix
Ready for professional risk evaluation
TR / EN
Bilingual
Turkish and English HSE content
HSE Risk Library

Demolition Hazards & Controls

Review the key hazards, consequences and control measures for Demolition in a structured professional HSE format.

01
Hazard

Uncontrolled structural collapse

Potential Consequence

Crushing, serious injury or fatality

Persons at Risk

Demolition crew and nearby personnel

Existing Controls

Demolition plan, structural assessment and controlled sequence

Additional Controls

Control removal of structural members according to the engineering plan

02
Hazard

Falling debris

Potential Consequence

Impact, crushing or fatality

Persons at Risk

Demolition and nearby site workers

Existing Controls

Exclusion zone and controlled debris management

Additional Controls

Prevent simultaneous work on lower levels

03
Hazard

Hidden electrical, gas or process service

Potential Consequence

Electric shock, fire or explosion

Persons at Risk

Demolition crew

Existing Controls

Service identification and isolation verification

Additional Controls

Field-verify all utilities and energy sources are isolated before demolition

04
Hazard

Uncontrolled structural collapse

Potential Consequence

Crushing or fatality

Persons at Risk

Demolition crew and nearby personnel

Existing Controls

Engineered demolition plan and exclusion zone

Additional Controls

Obtain authorized technical approval before changing the demolition sequence

05
Hazard

Hidden energy or utility service

Potential Consequence

Electric shock, gas release or fire

Persons at Risk

Demolition workers

Existing Controls

Service identification and isolation

Additional Controls

Physically verify electrical, gas and process isolations before demolition

06
Hazard

Demolition dust and debris

Potential Consequence

Respiratory or eye injury

Persons at Risk

Demolition workers and nearby personnel

Existing Controls

Dust suppression and suitable PPE

Additional Controls

Assess specific hazards such as asbestos or silica based on material composition

07
Hazard

Unexpected structural weakness during demolition

Potential Consequence

Sudden collapse

Persons at Risk

Demolition crew

Existing Controls

Engineering assessment and demolition plan

Additional Controls

Reassess structural condition as demolition progresses

08
Hazard

Uncontrolled dropping of demolition debris

Potential Consequence

Dropped-object injury

Persons at Risk

Personnel below

Existing Controls

Debris chute and exclusion zone

Additional Controls

Lower debris only through designated controlled methods

09
Hazard

Demolition equipment contacting live service

Potential Consequence

Electric shock, gas release or process release

Persons at Risk

Demolition workers

Existing Controls

Service isolation and field verification

Additional Controls

Physically verify all hidden utility isolations before demolition

SERNEM

Turn this into your project risk assessment

Use these ready hazards as your starting point, customize controls, evaluate risk levels and prepare your project-specific assessment in SERNEM.

Start Risk Assessment
SERNEM
Demolition RISK ASSESSMENT
SRN-HIRARC
Revision: 1.0
ACTIVITYDemolitionCATEGORYDemolition
#ActivityHazardConsequencePersons at RiskExisting Risk ControlLSRiskAction Required / Additional ControlsPerson in ChargeDue DateRLRSResidual Risk
01DemolitionUncontrolled structural collapseCrushing, serious injury or fatalityDemolition crew and nearby personnelDemolition plan, structural assessment and controlled sequence3515
High
Control removal of structural members according to the engineering plan--224
Low
02DemolitionFalling debrisImpact, crushing or fatalityDemolition and nearby site workersExclusion zone and controlled debris management3515
High
Prevent simultaneous work on lower levels--224
Low
03DemolitionHidden electrical, gas or process serviceElectric shock, fire or explosionDemolition crewService identification and isolation verification3412
High
Field-verify all utilities and energy sources are isolated before demolition--224
Low
04DemolitionUncontrolled structural collapseCrushing or fatalityDemolition crew and nearby personnelEngineered demolition plan and exclusion zone3515
High
Obtain authorized technical approval before changing the demolition sequence--224
Low
05DemolitionHidden energy or utility serviceElectric shock, gas release or fireDemolition workersService identification and isolation3412
High
Physically verify electrical, gas and process isolations before demolition--224
Low
06DemolitionDemolition dust and debrisRespiratory or eye injuryDemolition workers and nearby personnelDust suppression and suitable PPE236
Medium
Assess specific hazards such as asbestos or silica based on material composition--122
Low
07DemolitionUnexpected structural weakness during demolitionSudden collapseDemolition crewEngineering assessment and demolition plan339
Medium
Reassess structural condition as demolition progresses--122
Low
08DemolitionUncontrolled dropping of demolition debrisDropped-object injuryPersonnel belowDebris chute and exclusion zone339
Medium
Lower debris only through designated controlled methods--122
Low
09DemolitionDemolition equipment contacting live serviceElectric shock, gas release or process releaseDemolition workersService isolation and field verification3412
High
Physically verify all hidden utility isolations before demolition--224
Low
Prepared By
Name / Signature / Date
Reviewed By
Name / Signature / Date
Approved By
Name / Signature / Date
SERNEM • Professional Risk AssessmentWork should not begin until required controls are implemented.