Permit and Authorization
1
2
The permit is displayed or immediately available at the work location.
3
Required permit approvals and signatures are complete.
Critical4
The task-specific risk assessment or JSA has been reviewed.
Critical5
A task-specific toolbox talk has been completed and recorded.
6
Simultaneous operations and nearby activities have been assessed.
Personnel and Competency
7
Personnel performing the work are trained, competent and authorized.
Critical8
A competent supervisor is assigned and available.
9
Workers understand the emergency alarm, escape route and assembly point.
Atmospheric Testing
10
The need for atmospheric testing has been formally assessed.
Critical11
The gas detector is suitable, within calibration and function-tested.
Critical12
Oxygen concentration is within the site-approved safe range.
Critical13
Flammable gas or vapour concentration is below the permitted limit.
Critical14
Toxic gases relevant to the area have been tested where required.
Critical15
Continuous or periodic atmospheric monitoring is arranged where conditions may change.
CriticalFire Prevention and Fire Watch
16
Combustible and flammable materials have been removed or effectively protected.
Critical17
Suitable fire extinguishing equipment is immediately available.
Critical18
A trained fire watch has been assigned where required.
Critical19
The fire watch understands alarm methods, extinguisher use and stop-work authority.
Critical20
Openings, penetrations, drains and gaps are protected from sparks and slag.
Critical21
Spark and slag containment is effective for the work configuration.
Critical22
Fire detection or suppression systems affected by the task are properly managed.
Critical23
Post-work fire monitoring duration has been defined.
CriticalEquipment and Gas Cylinders
24
Hot work equipment has passed the required pre-use inspection.
Critical25
Electrical cables, plugs, electrode holders and connections are undamaged.
Critical26
The welding return connection is secure and positioned appropriately.
Critical27
Gas cylinders are upright, secured and protected from damage.
Critical28
Oxygen and fuel-gas equipment is free from oil, grease and contamination.
Critical29
Hoses, regulators, valves and connections are compatible and leak-free.
Critical30
Required flashback arrestors and non-return valves are correctly installed.
Critical31
Grinding wheels and cutting discs are suitable, undamaged and within their rated speed.
Critical32
Machine guards and handles are installed and correctly positioned.
CriticalPersonal Protective Equipment
33
Eye and face protection is suitable for the hot work process.
Critical34
Flame-resistant clothing provides adequate body coverage.
Critical35
Gloves are suitable for heat, sparks and the task being performed.
36
Safety footwear is suitable and protects against hot material.
37
Hearing protection is provided where noise exposure requires it.
38
Respiratory protection is provided where fumes or contaminants cannot be adequately controlled otherwise.
Critical39
Fall protection is provided where work-at-height exposure exists.
CriticalWork Area and Environmental Conditions
40
The work area is barricaded and warning signs are displayed.
41
Ventilation is adequate for fumes, gases and heat generated by the task.
Critical42
Lighting is sufficient for safe work and inspection.
43
Access and emergency escape routes are clear.
Critical44
Housekeeping is acceptable and trip hazards are controlled.
45
Weather conditions are suitable for the work.
46
Screens or barriers protect nearby personnel from arc radiation and flying particles.
Monitoring During Work
47
Permit conditions and control measures remain effective throughout the work.
Critical48
The fire watch remains in position and continuously observes the risk area.
Critical49
Workers continue to use required PPE correctly.
50
No gas leak, unexpected odour, alarm or process release is present.
Critical51
Hot slag, sparks and workpieces remain contained and controlled.
CriticalCompletion and Post-Work Inspection
52
The hot work equipment has been safely shut down and isolated.
Critical53
The work area and all potentially affected levels have been inspected.
Critical54
The required post-work fire-watch period has been completed and recorded.
Critical55
Hot materials, electrode stubs, slag and waste have been safely removed.
56
Temporary barriers, covers and fire protection controls are removed only when safe.
57
The permit has been formally closed by the authorized persons.
CriticalInspection result