TEMPORARY STAIRWAYS AND SAFE ACCESS TOOLBOX TALK
Maintain secure routes during construction changes.
Preview is public. A free SERNEM account is required to download the standard PDF.
Toolbox Topic
TEMPORARY STAIRWAYS AND SAFE ACCESS TOOLBOX TALK
Duration
8–10 MINUTES
Date
Site / Area
Supervisor
Company
Participants
Document No
OBJECTIVE
Prevent falls, slips and unsafe access on temporary stairs, platforms and connecting routes.
TOPIC EXPLANATION
Temporary stairs may be moved or altered as construction progresses. Check steps, landings and guardrails after changes.
Carrying bulky materials can hide steps and handrails. Use suitable handling or lifting methods for oversized loads.
Daily plans must maintain emergency escape routes, lighting, slip resistance and clear entry and exit.
REALISTIC SITE SCENARIO
A stair handrail was removed to move materials through the area.
The rail was not reinstated and a worker approached the exposed edge in poor light.
Authorised change control, interim guarding and hand-back checks would have reduced the hazard.
REMEMBER
Do not use temporary stairs with missing handrails, unstable steps or slippery surfaces.
KEY HAZARDS
Falls where handrails are missing.
Broken or absent steps.
Slippery treads.
Open edges at landings.
Insufficient lighting.
Loads obstructing sight lines.
Blocked stair entrances.
Unauthorised stair modification.
CONTROL MEASURES
Confirm authorised stair installation.
Inspect treads and landings.
Check handrails and edge protection.
Maintain non-slip clean surfaces.
Provide suitable stair lighting.
Keep entrances and exits clear.
Use safe methods for bulky loads.
Prevent unauthorised alterations.
Report and barricade unsafe access.
Re-inspect after any change.
SUPERVISOR TALKING SCRIPT
Stairways are safety-critical access. Do not use incomplete, slippery or unstable temporary stairs. Every modification needs control and reinspection.
DISCUSSION QUESTIONS
Are handrails complete?
Are the steps sound?
Are exits clear?
How do we move bulky loads?
Who can change the stairs?
PRE-WORK VERIFICATION
Installation checked
Treads intact
Landings safe
Handrails fitted
Slip controls present
Lighting sufficient
Entries clear
Load handling planned
No unapproved changes
Handover inspected
ATTENDANCE AND APPROVAL
Project / Site
Date
Presented by
Work area
Attendance and Signature
| # | Name | Position | Signature |
|---|---|---|---|
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| 11 | |||
| 12 |
Supervisor Signature
HSE Approval
SERNEM HSE Resource — Approved site procedure, risk assessment, manufacturer instructions and local regulations take priority.