Safety PacksAI Assistant
← Toolbox Library
SERNEM Toolbox● Ready8–10 minutes

PINCH POINTS TOOLBOX TALK

Keep hands, fingers and body parts clear of pinch and crush zones.

Pinch hazards, safe alignment and daily pre-work verification.

Checking account…
← Back to Toolbox Library

Preview is public. A free SERNEM account is required to download the standard PDF.

Toolbox Topic

PINCH POINTS TOOLBOX TALK

Duration

8–10 minutes

Date

Site / Area

Supervisor

Company

Participants

Document No

OBJECTIVE

✓

Prevent hand and finger injuries caused by trapping or crushing between moving components, equipment, pipework and fixed surfaces.

WHY IT MATTERS

✓

Pinch points are commonly created during routine tasks that appear simple.

✓

A pipe, cover or load moving only a few centimetres can cause severe crushing or amputation injuries.

✓

Use alignment tools, pry bars, drift pins, push-pull tools or mechanical assistance instead of placing hands in closing gaps.

REALISTIC SITE SCENARIO

✓

A worker placed fingers between two flanges while trying to align a pipe connection.

✓

The pipe shifted slightly on its support and the flanges closed suddenly, trapping the worker's hand.

✓

The event could have been prevented by securing the pipe, using alignment tools and keeping hands outside the pinch zone.

REMEMBER

✓

Never place your hand where a component can move, close or shift against another surface.

KEY HAZARDS

✓

Flanges and pipe connections.

✓

Moving loads.

✓

Doors, covers and hinges.

✓

Manual alignment of equipment.

✓

Rotating machinery components.

✓

Hydraulic or mechanical movement.

✓

Loads close to fixed structures.

✓

Unstable or unsupported materials.

CONTROLS

✓

Identify pinch points before starting.

✓

Keep hands clear of opposing surfaces.

✓

Use alignment tools instead of fingers or hands.

✓

Secure components before movement.

✓

Isolate energy capable of unexpected movement.

✓

Keep guards fitted to moving machinery.

✓

Do not support heavy components by hand during positioning.

✓

Wear suitable gloves but never rely on gloves as the primary control.

✓

Use one clear communication method during coordinated movement.

✓

Stop work if movement cannot be controlled.

SUPERVISOR MESSAGE

✓

Team, no one will place hands between flanges, pipes or moving components today. We will use suitable alignment tools and control any potential movement before starting.

TEAM QUESTIONS

✓

Where are today's pinch points?

✓

Which equipment could move unexpectedly?

✓

Which alignment tools will be used?

✓

How will the equipment be secured?

✓

Is energy isolation required?

✓

What will we do if positioning changes?

FIELD VERIFICATION

✓

Pinch points identified

✓

Energy controlled

✓

Component secured

✓

Alignment tools available

✓

Guards in place

✓

Hands clear of movement path

✓

Communication agreed

✓

PPE suitable

✓

Working space adequate

✓

Crew briefed

ATTENDANCE AND APPROVAL

✓

Project / Site

✓

Date

✓

Presented by

✓

Work area

Attendance and Signature

#NamePositionSignature
1
2
3
4
5
6
7
8
9
10
11
12

Supervisor Signature

HSE Approval

SERNEM HSE Resource – Permit conditions, risk assessments and site procedures take priority.