← Field forms

Free • TR / EN • Printable

Hot Work Pre-Start Safety Checklist

Review ignition hazards, adjacent activities and emergency readiness before welding or cutting. This is a preparation worksheet, not a hot-work permit or authorization.

Opens your browser print dialog. Entries are not uploaded or automatically saved.

How to use this worksheet

  1. Confirm the precise work location, task, equipment and approved permit status.
  2. Remove or protect combustibles; check sparks that may travel to lower levels or concealed cavities.
  3. Verify required atmospheric testing, ventilation, fire-watch competence and extinguishing equipment.
  4. Review nearby process lines, confined spaces and simultaneous operations.
  5. Apply the site-defined fire-watch and close-out requirements during and after work.

Worked field example

Example — Welding a pipe support: Remove combustibles below, protect penetrations, position suitable extinguishing equipment and assign a fire watch. Do not strike an arc before permit checks.

SERNEM — FIELD WORKSHEET

Hot Work Pre-Start Safety Checklist

Adapt this worksheet to actual site conditions.

Hot work details

Pre-start safeguards and owners

Hazard / areaRequired controlVerificationOwner

Fire control and close-out

This is not a hot-work authorization, gas-free certificate or permission to work in a hazardous atmosphere. Follow the applicable permit, fire protection and local legal requirements.

Frequently asked questions

How long must the fire watch remain?

Apply the period required by the relevant standard and site permit; one duration cannot be assumed across all industries and jurisdictions.

Are extra controls needed near a confined space?

Yes. Assess spark travel, gases, ventilation and interacting jobs under the appropriate permits.

Related SERNEM resources

Technical sources

This is not a hot-work authorization, gas-free certificate or permission to work in a hazardous atmosphere. Follow the applicable permit, fire protection and local legal requirements.