LOAD LANDING AND SLING REMOVAL SAFETY TOOLBOX TALK
Prevent crushing while placing and unhooking suspended loads.
Load stability, supports, lowering signals and controlled hook release.
Preview is public. A free SERNEM account is required to download the standard PDF.
Toolbox Topic
LOAD LANDING AND SLING REMOVAL SAFETY TOOLBOX TALK
Duration
8–10 MINUTES
Date
Site / Area
Supervisor
Company
Participants
Document No
OBJECTIVE
Prevent crushing, load tipping and pinch injuries while lowering, supporting and removing lifting accessories from loads.
TOPIC EXPLANATION
A load may remain unstable after it touches the ground or a support. Centre of gravity, slope, chocks and support capacity must be planned.
Removing or loosening rigging while the load is partly suspended or not reliably supported can trigger sudden movement.
Use one clear signalling arrangement and keep hands away from the interface between the load and its landing supports.
REALISTIC SITE SCENARIO
A team lowered a heavy pipe spool onto a steel cradle and began releasing rigging too early.
The spool rotated on the cradle, placing a nearby worker's fingers in a potential pinch zone.
Suitable chocks, verified stability and waiting until sling tension was fully removed would have controlled the event.
REMEMBER
Never release rigging until the load is stable and supported; keep hands clear of landing and crush zones.
KEY HAZARDS
Hand trapping between load and support.
Overturning of landing stands or frames.
Rolling or sliding load.
Premature sling release.
Recoil of hooks or lifting gear.
Personnel beneath suspended loads.
Insufficient chocks or supports.
Loss of signals between rigger and operator.
CONTROL MEASURES
Assess landing location and load centre of gravity.
Confirm stand, chock and support capacity.
Provide a stable clear landing area.
Restrict access to the landing zone.
Use the lifting-plan signalling arrangement.
Keep hands and feet away from crushing interfaces.
Lower slowly and verify stability.
Never unhook before rigging is unloaded.
Remove hooks and slings in a controlled sequence.
Reassess rolling and sliding risks after landing.
SUPERVISOR TALKING SCRIPT
The landing and unhooking phase is a critical part of every lift. Confirm the load is fully supported and cannot move. Nobody is to put hands or feet beneath the load.
DISCUSSION QUESTIONS
Where will the load be supported?
Could it roll or slide?
Is it fully stable?
Who releases the slings, and when?
Who gives lowering commands?
PRE-WORK VERIFICATION
Landing location ready
Centre of gravity assessed
Supports rated
Chocks available
Exclusion zone set
Slinger identified
Hands and feet clear
Load stability verified
Rigging tension removed
Crew briefed
ATTENDANCE AND APPROVAL
Project / Site
Date
Presented by
Work area
Attendance and Signature
| # | Name | Position | Signature |
|---|---|---|---|
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 | |||
| 6 | |||
| 7 | |||
| 8 | |||
| 9 | |||
| 10 | |||
| 11 | |||
| 12 |
Supervisor Signature
HSE Approval
SERNEM HSE Resource — Task-specific risk assessment, authorised procedures, manufacturer instructions and local law take precedence.