DEMOLITION AND DISMANTLING TOOLBOX TALK

Removing one component can change the behaviour of everything connected to it.

Management of structural stability and falling parts during controlled dismantling.

Checking account…
← Back to Toolbox Library

Preview is public. A free SERNEM account is required to download the standard PDF.

Toolbox Topic

DEMOLITION AND DISMANTLING TOOLBOX TALK

Duration

8–10 minutes

Date

Site / Area

Supervisor

Company

Participants

Document No

OBJECTIVE

✓

Prevent unexpected collapse, falling objects, stored-energy release and line-of-fire exposure during demolition and dismantling.

WHY IT MATTERS

✓

Removing one component during dismantling can change load paths and cause unexpected movement of connected structures or equipment.

✓

Older systems may contain undocumented connections, trapped energy, process residues or hidden supports.

✓

If actual weight and center of gravity are unknown, components may rotate or drop unexpectedly during lifting.

✓

Changing the dismantling sequence can invalidate the original risk assessment.

✓

Workers below and around the dismantling area must remain outside the exclusion zone.

REALISTIC SITE SCENARIO

✓

A crew dismantling steelwork decided to cut a support earlier than planned to improve access.

✓

Once the support was removed, the connected section changed load path and moved unexpectedly.

✓

No worker was beneath the area, but the component struck nearby equipment.

✓

Following the approved dismantling sequence, installing temporary support and reassessing changes would have prevented the event.

REMEMBER

✓

If the dismantling sequence changes, the risk assessment must change too.

KEY HAZARDS

✓

Uncontrolled structural movement.

✓

Falling components.

✓

Hidden energy sources.

✓

Sharp edges.

✓

Work at height.

✓

Unstable heavy components.

✓

Incorrect dismantling sequence.

✓

Unauthorised access.

CONTROLS

✓

Plan the dismantling sequence.

✓

Isolate energy sources.

✓

Assess temporary-support requirements.

✓

Establish exclusion zones.

✓

Determine component weights.

✓

Plan lifting methods.

✓

Check connected members before cutting.

✓

Control sharp edges.

✓

Apply work-at-height controls.

✓

Stop and reassess if the plan changes.

SUPERVISOR MESSAGE

✓

Team, no dismantling component will be treated as independent. Before cutting we must understand what it supports, what it is connected to and how the system will react; any sequence change requires stop-work and reassessment.

TEAM QUESTIONS

✓

Is the dismantling sequence defined?

✓

Is energy isolated?

✓

Is temporary support required?

✓

Are component weights known?

✓

Is the area below controlled?

✓

What happens if the plan changes?

FIELD VERIFICATION

✓

Sequence approved

✓

Energy isolated

✓

Support assessed

✓

Area barricaded

✓

Component weight known

✓

Lift plan ready

✓

Connections checked

✓

Sharp edges controlled

✓

WAH controls in place

✓

Crew briefed

ATTENDANCE AND APPROVAL

✓

Project / Site

✓

Date

✓

Presented by

✓

Work area

Attendance and Signature

#NamePositionSignature
1
2
3
4
5
6
7
8
9
10
11
12

Supervisor Signature

HSE Approval

SERNEM HSE Resource – Permit conditions, risk assessments and site procedures take priority.