Competent Person Inspection
- ✓Arrange a visible-defect inspection before each shift.
- ✓Reinspect after alterations or events affecting integrity.
- ✓Never use an uninspected scaffold.
SafeBase
Health and Safety Resources
Inspect • Verify Status • Use Safely
Document
SB-SCF-001
Revision 1.0

Scan
Checklists, toolbox talks and professional guides
SafeBase Pre-Job Control
Critical Stop Criteria
There is no valid inspection status or approval for use
Stop work immediately if platforms or guardrails are incomplete, or access is unsafe
The scaffold is leaning, settled or unstable
Components are damaged or connections are loose
The scaffold is overloaded or materials are stored unsafely
Technical Control
4×
Maximum intended load
2,5 cm
Normal platform gap
0,6 m
Access-system threshold
EACH SHIFT
Competent-person inspection
Reference
OSHA 29 CFR 1926.451
OSHA 1926 Subpart L
Personal Protective Equipment
Chin-Strap Helmet
EN 397
Safety Glasses
EN 166
Work Gloves
EN 388
Slip-Resistant Footwear
ISO 20345
Safety Harness
EN 361
Engineering controls first, personal protection second.