HSE Field GuideSERNEM Pro SeriesSite validation required

SERNEM

Health and Safety Resources

LOTO Critical Safety Rules

Identify • Isolate • Lock Out • Verify Zero Energy

OSHA 1910.147(c)(6)OSHA · US general industry · Verify local requirements separately

Document · EN

SRN-LOTO-001

Revision 2.0

Content updated

SERNEM poster QR code

Scan: open the digital poster library

SERNEM · Check Before StartingPre-Job Check

Energy procedure
All energy sources
Affected employees
Personal locks
Stored energy
Isolation verification
Safe restoration
01REQUIRED

Identify Energy Sources

  • Identify electrical, mechanical, hydraulic, pneumatic and thermal energy.
  • Include gravity, pressure, chemical and stored energy sources.
  • Review the machine-specific energy-control procedure.
02REQUIRED

Notify Affected Employees

  • Notify affected employees before shutdown and lockout.
  • Explain the work scope and expected duration.
  • State clearly that the machine must not be restarted.
03REQUIRED

Shut Down Equipment

  • Shut down the machine using its normal stopping procedure.
  • Prevent additional hazards caused by an uncontrolled shutdown.
  • Wait until all moving components have fully stopped.
04REQUIRED

Isolate Every Energy Source

  • Place every energy-isolating device in the safe position.
  • Physically isolate valves, breakers, disconnects and supplies.
  • Never use control buttons as energy-isolating devices.
05REQUIRED

Apply Locks and Tags

  • Each authorized employee must apply a personal lock.
  • Include the employee name, date and work information on the tag.
  • Use an approved group lockbox or hasp for group lockout.
06REQUIRED

Control Stored Energy

  • Release pressure, restrain springs and reduce temperature safely.
  • Lower or mechanically block elevated components.
  • Maintain control when energy may reaccumulate.
07REQUIRED

Verify Zero Energy

  • Attempt a normal start to confirm that no movement occurs.
  • Perform required measurements using suitable test instruments.
  • Return all controls to the safe off position after testing.
08REQUIRED

Restore Energy Safely

  • Inspect the area and remove employees, tools and unnecessary materials.
  • Each employee must remove only their own lock under the procedure.
  • Notify affected employees before restoring energy.

Stop Work Now

Stop work immediately if all hazardous energy sources are not identified

Stop work if energy-isolating devices are not locked and tagged

Stop work if stored or residual energy is not controlled

Do not begin work until zero-energy status has been verified

Never remove another employee's lock outside an approved special procedure

Critical Controls

ALL

Identify hazardous energy sources

VERIFY

Test isolation

PERSONAL

Authorized employee lock

≥1/YEAR

OSHA: energy-control procedure inspection; authorized employee other than the user

Technical Reference · Validation Required

OSHA 1910.147(c)(6)

Verify source scope and local requirements

Risk-Based PPE Selection

Safety Helmet — Task-specific head risk

Safety Glasses — Task-matched eyewear

Task-Specific Gloves — Match the energy hazard

Safety Footwear — Task-matched sole

Task-Specific PPE — Based on residual hazards

Select PPE by risk, manufacturer and site procedure; this list is not mandatory for every task.

SERNEM

Better Safety, Better Tomorrow.

Stop Work If It Is Unsafe!

Verify site procedure

www.sernem.com

REQUIRED: work control · REQUIRED IF: binding when applicable · WARNING: hazard alert. Verify legal applicability separately.