Overview
Spoil Pile Management should be managed through a planned system of work: identify the task-specific hazards, eliminate exposure where practical, use engineered or collective controls before relying on PPE, verify critical safeguards before starting, and stop the task when controls are missing or conditions change. This guide applies those principles specifically to controlling excavated material, surcharge loads and falling material near excavation edges.