Overview
Post-weld heat treatment exposes crews to electrical heater circuits, insulated hot surfaces and prolonged unattended energy. Before energization, the approved WPS/PWHT package must identify welds, material, instrument locations, equipment ratings and quality hold points. Supervisors should coordinate the exclusion zone with adjacent trades, verify fire protection, and record the complete heating and cooling cycle. This guide is for HSE planning: it does not set heat treatment temperatures, dwell times or cooling rates.