Professional lockout / tagout inspection

Lockout / Tagout Safety Checklist

Verify hazardous-energy identification, equipment shutdown, isolation, lock application, stored-energy control, zero-energy verification and safe re-energization before work begins.

Progress

0%

Compliance score

0%

Critical findings

0

Live energy-control status

VERIFICATION REQUIRED

The inspection is incomplete. Complete all applicable items before work begins.

Authorization and Planning

1

A valid work permit or approved energy-isolation authorization has been issued for the task.

Critical
2

A current equipment-specific lockout/tagout procedure is available at the work location.

Critical
3

The equipment, work scope, isolation boundaries and affected systems are clearly defined.

Critical
4

A task-specific risk assessment or JSA has been completed and communicated to the work team.

Critical
5

An authorized and competent person is responsible for coordinating the isolation.

Critical

Communication and Personnel

6

Affected employees have been informed that the equipment will be shut down and isolated.

Critical
7

All workers involved understand the isolation scope, hazards, responsibilities and restoration process.

Critical
8

Only trained and authorized employees are applying, changing or removing locks and tags.

Critical
9

Simultaneous operations and nearby work activities have been reviewed and coordinated.

Energy Source Identification

10

All hazardous energy sources connected to the equipment have been identified.

Critical
11

Electrical supplies, circuits, control power and possible backfeeds have been identified.

Critical
12

Mechanical energy from moving, rotating, suspended or tensioned components has been identified.

Critical
13

Hydraulic, pneumatic, vacuum and pressurized-system energy sources have been identified.

Critical
14

Thermal, chemical, steam, gas, liquid and process energy sources have been identified.

Critical
15

Stored or residual energy such as pressure, springs, capacitors, gravity and heat has been identified.

Critical

Equipment Shutdown

16

The equipment has been shut down using the normal operating controls.

Critical
17

The approved shutdown sequence has been followed to prevent additional hazards.

Critical
18

Operating controls have been placed in the off, neutral or safe position.

Critical
19

The process and connected equipment have been stabilized before isolation begins.

Critical

Isolation Application

20

All required disconnecting devices, breakers, valves and isolation points are in the safe position.

Critical
21

Physical separation, blanking, blinding or disconnection is used where required.

Critical
22

Push buttons, selector switches, software commands or control circuits are not used as the sole means of isolation.

Critical
23

Isolation valves are closed, secured and protected against unintended movement.

Critical
24

Moving, suspended or elevated components are blocked, lowered or mechanically secured.

Critical

Lock and Tag Application

25

Each authorized worker has applied their personal lock to the approved isolation device or group lock system.

Critical
26

Locks are uniquely keyed and clearly identifiable to the person who applied them.

Critical
27

Tags include the worker's name, date, department and reason for isolation.

Critical
28

Locks and tags are securely attached and cannot be removed without deliberate action.

Critical
29

Lockout devices are suitable for the equipment and environmental conditions.

Stored Energy Control

30

Stored pressure, trapped fluids, gases, steam and vacuum have been safely released or restrained.

Critical
31

Electrical capacitors and other energy-storage devices have been discharged and verified.

Critical
32

Springs, counterweights and tensioned components have been released or securely restrained.

Critical
33

Gravity hazards are controlled by lowering, blocking, pinning or otherwise securing components.

Critical
34

Potential reaccumulation of hazardous energy is continuously monitored and controlled.

Critical

Zero-Energy Verification

35

A start attempt or operational test has been performed to verify that the equipment cannot operate.

Critical
36

Absence of electrical voltage has been verified with a suitable and proven test instrument.

Critical
37

The electrical test instrument was proved before and after the absence-of-voltage test.

Critical
38

Pressure gauges, drains, vents or other methods confirm that pressure has been removed.

Critical
39

Operating controls have been returned to the off or neutral position after the verification test.

Critical
40

The authorized person has confirmed and documented a zero-energy state before work begins.

Critical

Group LOTO and Shift Control

41

A controlled group lock box or equivalent system is used when multiple workers are involved.

Critical
42

Every worker is individually accounted for and protected by a personal lock.

Critical
43

A documented lock-transfer or shift-handover process maintains continuous protection.

Critical
44

Contractor and site lockout/tagout responsibilities are coordinated and understood.

Critical

Restoration and Re-Energization

45

The work area has been inspected and tools, temporary grounds, blocks and loose materials have been removed.

Critical
46

Guards, covers, safety devices and equipment components have been correctly reinstalled.

Critical
47

All personnel are clear of the equipment and safely positioned before energy is restored.

Critical
48

Each personal lock is removed only by the employee who applied it, except under an approved exceptional-removal procedure.

Critical
49

Affected employees have been notified before locks are removed and equipment is re-energized.

Critical
50

Energy is restored in a controlled sequence by an authorized person.

Critical
51

The equipment is function-tested safely and abnormal conditions are immediately controlled.

Final Authorization

52

The isolation record, permit and associated documentation have been completed and formally closed.

Critical

Inspection Summary

Live overview calculated automatically from the lockout / tagout inspection responses.

Total questions

52

Answered

0

Yes answers

0

No answers

0

N/A answers

0

Completion

0%

Compliance

0%

Critical findings

0

Open actions

0

High / critical priority

0

Findings Summary

Corrective actions created from lockout / tagout items answered No.

No findings recorded

Items answered No will automatically appear in this section.

Inspection result

Inspection incomplete

Answer every applicable item to complete the inspection.

Completed

0/52

Compliance score

0%

Critical findings

0