Professional lifting operations inspection

Lifting Operations Inspection Checklist

Inspect lifting plans, crane setup, load details, rigging equipment, exclusion zones and communication controls before the operation begins.

Progress

0%

Compliance score

0%

Critical findings

0

Live safety status

WARNING

The lifting inspection is incomplete. Complete all applicable items.

Planning and Authorization

1

An approved lifting plan is available and matches the actual operation.

Critical
2

The lifting supervisor, operator, rigger and signaler are trained and authorized.

Critical
3

A pre-lift briefing has been completed with all involved personnel.

Load Assessment

4

The load weight, dimensions and center of gravity are confirmed.

Critical
5

Approved lifting points are identified and suitable for the load.

Critical
6

The load is stable and loose parts have been secured.

Critical

Crane and Equipment

7

The crane or lifting equipment has adequate rated capacity for the planned lift.

Critical
8

Crane, lifting appliance and accessory inspection certificates are valid.

Critical
9

The crane and safety devices have been inspected and are in serviceable condition.

Critical
10

Ground conditions are stable and capable of supporting the crane and load.

Critical
11

Outriggers are fully deployed with suitable mats or support where required.

Critical

Rigging Equipment

12

Slings, shackles, hooks and other accessories are correctly selected for the load.

Critical
13

All rigging equipment has been visually inspected before use.

Critical
14

Sling angles and resulting forces are within acceptable limits.

15

Hooks have functioning safety latches and are correctly connected.

Work Area Controls

16

A clearly defined and barricaded lifting exclusion zone is established.

Critical
17

No person is positioned beneath or within the fall zone of a suspended load.

Critical
18

Overhead structures, pipelines and electrical lines have been assessed.

Critical
19

The lifting and load travel path is clear of obstructions.

Communication and Execution

20

A clear communication method and one designated signaler are established.

Critical
21

A controlled test lift is performed to verify balance, rigging and brake function.

Critical
22

The lift will not involve side loading, dragging or shock loading.

Critical

Environmental Conditions

23

Wind speed, visibility and weather conditions are within permitted limits.

Critical

Final Verification

24

The landing area is prepared, stable and clear before the load is moved.

Critical

Inspection Summary

Live overview calculated automatically from the inspection responses.

Total questions

24

Answered

0

Yes answers

0

No answers

0

N/A answers

0

Completion

0%

Compliance

0%

Critical findings

0

Open actions

0

High / critical priority

0

Findings Summary

Corrective actions created from items answered No.

No findings recorded

Items answered No will automatically appear in this section.

Inspection result

Inspection incomplete

Answer every applicable item to complete the inspection.

Completed

0/24

Compliance score

0%

Critical findings

0